Insiders Project S1E3 - Top of Kyiv's South Bridge
0.0/10 by 0 users
The shooting crew follows through the internal constructions of the South Bridge. Having passed the whole bridge inside, the team goes up vertical cables 300 meters long. A hand-made construction for ascent, strong arms and self-confidence - these are the only things the team relies on. Throwing a climbing hook with a rope, the shooting crew gets to the peak using a hand-made ladder.
| Released | Nov 27, 2016 |
|---|---|
| Runtime | 26min |
| Genre | Documentary |
| Actor | N/A |
| Director | N/A |
| Production | FILM.UA Group |